Most of the building is in place although far from being finished.So far nothing has been done to the interior and several parts of the exterior as well as the grounds around the Pavilion still need to be done.
In the rear of the building, where the restaurant patio would go, the surface is still plywood.
In the working photos, it appeared that an exit to the theater was directly below the end of the restaurant patio, but for now it is unfinished.
The bell tower is in place, but I noticed that some adjustments will need to be made. That will happen soon.
In the first picture, there are no doors, but in the last two, they have been added.The door texture was added to a prim and then a script was added so that as a person approaches, the doors swing open. But just in case the avatar move faster that the doors open, they were made "phantom". This means that you can walk right through the doors even if they remain closed.
It was noticed that I put doors at the back of the large section leading to the common patio area. There were however, no doors there, just a floor to ceiling window. I'll change that out in a couple days when time permits.
Well, as you can see, the building is taking shape and does resemble the actual Belgium Pavilion. That was all there was time for on the 30th of January, more to come in the next several days.